A proven technology, deployed step by step

CemTower, developed by Danish company CemGreen, is already in industrial operation. It preheats, calcines and cools the clay in one compact vertical unit, and reuses the heat it recovers.

< 50kg CO₂per tonne of SCM produced

  • Proven at industrial scale
  • Heat recovery built in
  • Compact and modular
  • Simpler, gradual deployment

A local SCM, made for cement and concrete producers

Calcined clay is a supplementary cementitious material, or SCM: suitable clay, thermally activated, replaces part of the clinker in cement and concrete.

CCI will produce it in Israel, from Israeli clays, and supply it to the companies that make cement and concrete. We do not make cement or concrete ourselves: we help those who do lower their carbon footprint.

  1. Clay resources
  2. Controlled calcination
  3. A qualified SCM
  4. Cement and concrete

Your supplier and decarbonisation partner. Never your competitor.

How CemTower works

Exterior view of a CemTower, with preheating at the top, calcination in the middle and cooling at the bottom.
  1. Incoming material is progressively heated before reaching the calcination zone. Heat recovery helps reduce the energy required for this stage.

  2. External heating and process controls provide the thermal treatment required to activate the selected clay.

  3. The processed material is cooled, and its heat is recovered for reuse within the system.

Preheat
Incoming material is progressively heated before reaching the calcination zone. Heat recovery helps reduce the energy required for this stage.
Calcine
External heating and process controls provide the thermal treatment required to activate the selected clay.
Cool and recover
The processed material is cooled, and its heat is recovered for reuse within the system.

Compact and modular

Each tower is a compact unit. Capacity is added in stages, which makes deployment simpler and more gradual. Plant design and energy choices are set for the project and the local clay.

Its modular design lets capacity grow in stages, as demand and qualification progress.

Green steel wall and spiral staircase of a CemTower installation.

Resource. Process. Performance.

Every project starts with the clay: it is characterised, tested in the process, then qualified in the intended cement and concrete mixes.

CemGreen’s laboratory and pilot plant support each step. The goal: a consistent SCM that producers can rely on.